Bishop-Fenwick Stadium

Middletown, Ohio

The Kleingers Group played a key role in planning and designing the current Bishop Fenwick High School campus located on State Route 122 in Middletown. Kleingers provided conceptual design input, surveying and mapping, traffic impact studies, public roadway improvements, as well as site construction design documents and value engineering in conjunction with the construction of the school. The 95,000 SF school building is situated on a 66-acre campus. Site facilities include on-site parking for 446 cars, an athletic complex consisting of a two natural turf stadiums with two field house buildings, two baseball diamonds, two softball diamonds, five tennis courts, one full-size and one half-size football practice fields and two full-size soccer practice fields.

Football

Track

Baseball

K-12 Education