Athens, Ohio
Sportworks performed drainage performance testing and civil engineering services for the synthetic turf replacement project at Ohio University’s Peden Stadium.
The University installed its first synthetic turf system at the stadium in 2002. “We went through an extensive research process to find the best playing surface for our student-athletes,” said Assistant Athletic Director for Facilities Jason Farmer.
Sportworks Design played a key role in educating and assisting us in selecting the best product available within their budget – AstroTurf’s Gameday 3D X 52 turf system.